India's Rooftop Solar Push Needs Nearly Double the Technicians It Had Two Years Ago

Author
TalentCo
Summary

India's solar workforce needs to grow from around 180,000 skilled professionals in 2024 to more than 300,000 by the end of 2026 as rooftop installations accelerate nationwide.

share:

https://talentco-76111e.webflow.io/news-and-insights/indias-rooftop-solar-push-needs-nearly-double-the-technicians-it-had-two-years-ago

Link copied!

=Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Rooftop solar is expanding rapidly

India's installed solar capacity has passed 90 GW as the country works towards a 500 GW renewable energy target. The PM Surya Ghar Muft Bijli Yojana rooftop solar scheme has already reached 5 million home installations.

Growth is creating demand across solar engineering, procurement and construction, rooftop commercial and industrial projects, manufacturing, grids, storage and electric-vehicle charging infrastructure.

The workforce needs to nearly double

India's solar sector is expected to require more than 300,000 skilled professionals by the end of 2026, compared with around 180,000 in 2024.

Employers including Adani Green Energy, Tata Power Solar, Waaree Energies and ReNew Power are hiring particularly actively in Rajasthan, Gujarat, Maharashtra, Karnataka and Tamil Nadu.

Formal training is already paying off

Workers with diplomas or recognised certifications can earn starting salaries 20% to 35% higher than self-taught technicians in comparable roles. Relevant qualifications include MNRE installer certification and BEE energy-auditor credentials.

With national capacity targets still far above today's installed base, the shortage of installers, design engineers and battery specialists is likely to remain a long-term labour-market issue rather than a temporary hiring spike.

Sources:
Indian Institute of Solar Energy — Solar Job Market Report India 2026 — 27 June 2026
Bluebird Solar — PM Surya Ghar at 50 Lakh Homes — 5 August 2026

Get our insights straight to your inbox
Perspectives from the TalentCo team on trends, strategies, and shifts shaping the future of talent. Explore how we're thinking about talent, work, and what's next.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Learn, grow, and land better jobs with our integrated upskilling and job search solution.